The objective of this project is to develop, design, build, test, optimize and commission FPPs first full-scale wave PTO system. The resulting PTO design will be used to build four identical PTO units
The first purpose is to optimize and demonstrate Exowave wave energy concept in a coastal offshore environment, where the produced seawater under high pressure is led ashore and converted to fresh
The Ocean Energy Systems (OES) Task 10, Part II continues the work on verification and validation of numerical models of Wave Energy Converters (WECs) previously supported by EUDPJ.nr. 64017-05197.
The objective of the project is to make a 24 m long 1:10 scale version of a Leancon wave power machine that uses airflows created by a wave moving up and down a tube. The project is based on a
The project aims at optimising Wave Star wave machine production from irregular waves through sophisticated control of the back pressure in the hydraulic system in each floater. The system is being
The project gathers international research communities to develop design tools and a common design basis for wave power facilities to make them more competitive. The aim is to develop a wave-to-wire
Grid connection and electricity production optimisation from a 500 kW Wave Star wave power unit located at Horns Rev. The project is closely linked to project 10239. If the project achieves the