The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
The long-term goals of OES are:
1. To assess and establish confidence in the use of Wave Energy Converters
2. To engage and integrate Danish industry in international initiatives
3. To identify
The Danish wave power industry has in connection with this application created a partnership that aims to initiate, strengthen and develop cooperation, and develop a comprehensive joint strategy for
The next step in the development of the Wave Dragon technology is the deployment of a full-scale device in open sea. The development of a 1.5 MW Wave Dragon demonstrator will be based on experiences
Establishment of a data base of O&M data for Wave Dragon established in Nissum Bredning. Large uncertainty exists about fatigue impact on single components used in a wave device caused by repeated
Waveenergyfyn v/ Henning Pilgaard
ForskEL
2010
2011
Use the link Edit/view Data Sheet to edit project description
DEXA1:5 is a development project which aims to use an innovative, simple and flexible technology to validate wave energy as a cost-effective, competitive source of electrical power. Activities defined