The objective of this project is to develop, design, build, test, optimize and commission FPPs first full-scale wave PTO system. The resulting PTO design will be used to build four identical PTO units
The first purpose is to optimize and demonstrate Exowave wave energy concept in a coastal offshore environment, where the produced seawater under high pressure is led ashore and converted to fresh
The Ocean Energy Systems (OES) Task 10, Part II continues the work on verification and validation of numerical models of Wave Energy Converters (WECs) previously supported by EUDPJ.nr. 64017-05197.
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
DanWEC Fonden
Green Labs DK
2013
2013
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building