The objective of this project is to develop, design, build, test, optimize and commission FPPs first full-scale wave PTO system. The resulting PTO design will be used to build four identical PTO units
The first purpose is to optimize and demonstrate Exowave wave energy concept in a coastal offshore environment, where the produced seawater under high pressure is led ashore and converted to fresh
The Ocean Energy Systems (OES) Task 10, Part II continues the work on verification and validation of numerical models of Wave Energy Converters (WECs) previously supported by EUDPJ.nr. 64017-05197.
The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
The long-term goals of OES are:
1. To assess and establish confidence in the use of Wave Energy Converters
2. To engage and integrate Danish industry in international initiatives
3. To identify