The purpose of this project was to reveal the possibilities of transport of hydrogen via the existing Danish natural gas grid. The investigation only covers the distribution grid. For this purpose, a
The goal of the project was to construct and test a 10 kW CHP (5 kWe) PEM FC generator aimed for single-family households in Denmark. Two generators, each 'half size' of the project generator goal
The PEM fuel cell car will function as a laboratory where components and modules in the future can be upgraded with improved version. Danish industry gets in this way an opportunity to develop and
The project will demonstrate the concept of application of reversible fuel cells integrated into a building, with generation of hydrogen from excess electricity from nearby renewable energy systems
Based on the results from the project's Part l, the purpose of project tasks described in this report was to reconfigure / update the vehicle for dynamical operation with a Danish-produced PEM fuel
Facing a market structure of independent heating systems and cost-of-service regulation the regulator considers ways to create incentives for increasing efficiency in heat production. One way is to
The activities were: Development of improved components, analysis of durability, contacting, improving the methods, materials development, studies of mechanisms and of defect and structural chemistry
In the autumn of 1999 the IC plant at Nordborg Power Plant was commissioned, and following that the emissions and emission reductions of the plant were measured.
The project aim is to develop an integrated SOFC module (standard module) which can be based on the most cost effective materials and manufacturing processes in order to reduce SOFC plant expenses.
A new anode has been developed. By using ceria, doped with gadolinia and sintered at low temperature on a surface with coarse zirconia anchoring particles, an electrochemically active anode is formed.
The purpose of this research project has been to develope and test equivalent models of district heating (DH) systems with regard to on-line optimization of the operational costs of the complete