The aim of the project is to identify, develop and describe existing and new concepts on the supply and installation side and demonstrate that renovations can live up to demands regarding energy
The objectives of this project is to improve on the current practice of basing performance evaluation on a single point measurement of wind speed and instead introduce a method where the wind field
This project has investigated noise emissions from large-scale wind turbines in relation to small-scale wind turbines. In addition, noise nuisance at low frequencies was investigated, noise
The project investigated the conditions of applying district heating-driven adsorption heating pumps with underground storage for cooling and heating. The concept is most suitable for buildings with a
The aim of the project is to develop a simulation platform for generation of relevant wind fields applicable for aeroelastic design simulations. This is achieved by development, verification, and
Air tightness must be brought into focus at an early stage in the planning process, and during the construction phase air tightness measurements should be performed, e.g. on facade sections or in
This project evaluated the performance of the ventilation systems in eight childcare centres, four of which have a natural ventilation system and four others a mechanical ventilation system. The
The annex will give the participants an overview of the technical and environmental assessment challenges encountered in offshore applications and help them to understand the areas of further R and D
Together with the sector suppliers, the project developed a complete testing basis for assessment of the energy properties of ventilation devices on the basis of recognised Danish and foreign
Based on experience with ESCO projects in a number of local authority areas, NRGi Rådgivning developed and evaluated a phase-divided model for an ESCO partnership aiming to make it easier for the
In 1,452 households with remote-read meters in the Syd Energi supply area, customers received regular feedback on their electricity consumption via SMS or e-mail in a pilot project. The subsequent
The project idea is to use prefabricated thermo-active structures as concrete slabs with embedded plastic pipes (PEX). The active concrete slabs are used both as cooling and heating system, peak load
This project has included a PhD course at Aalborg University (AAU) and the Technical University of Denmark (DTU)/University of Southern Denamrk (SDU) and it has developed two types of converter which
The present R and D will be used to build a 1:10 scale model of a single AquaBuOY and test and measure its performance in a range of sea conditions at the testsite in Nissum Bredning on 5 meters deep
The wind farm output of an offshore-farm such as Horns Rev changes between nearly constant output to highly variable power output. A balance responsible would benefit from knowing the variability of a
The project studied use of information and communication technologies (ICT) in private homes through qualitative interviews, and the consequences for electricity consumption were analysed. Scenarios
The solar shading system development is based on analyses of daylight conditions at different types of solar-shading glass louvres under the IESve/Radiance programme. The chosen system has glass
Magnetic refrigeration is an emerging technology using solid, non-volatile magnetic materials as the active components, and water or alcohol as the medium for heat transport. It holds great potential
Through interviews about and analyses of typical electricity-consuming systems, the project examined how industry can optimise system solutions. Surveys showed that cheap equipment with relatively low