The objective of BLATIGUE-2 is to develop fast and efficient fatigue testing methods for large wind turbine blades, to develop smart equipment to excite the blades under such tests and to increase
The purpose of the project is to increase the liability of blades in operation by installing RTZ Solution. Further, the purpose is to reach higher cost efficiency and higher AEP for the wind turbine
Fatigue of fiber rope is crane applications is not well established, why extensive full-scale testing is currently required for using fiber ropes in crane applications. The main objective of this
LERCat enables leading edge roughness (LER) repairs of wind turbine blades at the right time, yielding a 1 bn DKK/year gain across the partners’ turbine fleets. This is achieved by establishing an
The project involves the development and maturement of a drone charging station and a drone system. The combined system should then be capable of conducting autonomous wind turbine inspections and
Managing offshore corrosion is a subject that is heavily regulated and combined with several industry standards that must be followed to ensure the structure integrity of the assets. Yet, whilst, and
The purpose of IDEA is to establish reference site conditions and wind reference wind farm designs for floating wind turbines. The project follows the international IEA project on wind farm design and
The overall objective of this project is to further adapt, improve and expand the existing operational tracking technology that Claviate has developed to cover the entire onshore wind turbine
We aim to demonstrate that a radically new blade technology combining jointed modular blades with advanced tips made with additive manufacturing can enable increased rotor sizes by up to 20% and lead
This project is the first phase in the development of an advanced test facility which will enable the wind power industry to develop and test new grid connection solutions, and validate the grid
The objective of the project has been to develop and commercialize nacelle-LIDAR technology for power performance verifications such that the expensive and often difficult use of met masts offshore
The project dealt with: optimal use of vortex generators, VGs, that are presently used on most wind turbine blades. Their main effect is to delay separation in the inner part of the blades where for
The projecthas developed a methodto measurenoisefromairfoilsinan industrialwind tunnel,which willhelp to increase theDanishwind turbinecompetitiveness.The methodisthe key tonew
It is a concern in wind energy that wind turbines do not yaw efficiently into the wind due to draw backs of nacelle anemometry. The loss of power is estimated to be 1-3% in flat terrain and offshore
The main goal of the project was to develop, demonstrate and implement new tools, models and components in the design process for aeroelastic optimization of Mega-Watt wind turbines with the scope of
The project has used tools for process simulation to improve understanding of wind turbine blades. Based on the measurements, the project participants designed a new wing, followed by a demonstration