The Megavind Partnership was founded in 2006 and the project 2008-2010 is a continuation of the earlier stages of the partnership. It has been the goal of the partnership to establish the foundation
The work is a part of the international cooperation to the IEA-Wind Implementing Agreement, and belongs to a new task - Annex 28: Social Acceptance of Wind Energy Projects. The project has collected
This project is motivated by the vision of being able to understand and model complex structural mechanisms and failure in large composite structures such as current and future wind turbine blades
The project aims at developing a meteorological software tool for large wind farm planning. The project is based on data from previous projects on large wind farm shadow effect. The existing tools
The project focuses on a theoretical and experimental study of floating platforms for wind turbines, wave power systems and the relationship between wind and wave power. The project basis is the
The objective is to improve the design basis for large wind turbines by measuring wind and turbulence profiles at high altitude above a flat ground using modern instruments. The project will study
The vision is that the increased research on main wind turbine uncertainties and risk & reliability will lead to less conservative designs and more cost-efficient wind energy. Therefore, careful
The usage of new reinforcement fibre and resin systems allows for novel forms of blade design, cost optimisation and production methods that significantly reduces the production time.
The cooperation project is conducted with a PhD study as its central element and its research will be used directly in wind turbine and wnd farm development so as to prepare common guidelines under
The objective of the project was to build a demo-plant applying a new d.c. technology and to test in an onshore location with the purpose to investigate technical and financial possibilities for a d.c
This project involves experimental verification of three Risø-A airfoils to evaluate their application on Danish wind turbines. The Risø-A airfoils were designed for both stall and pitch regulation by
The project is the first step in a research effort with the overall objective to prepare technical guidelines for grid connection of wind farms to weak grid, and to identify and develop technical
This Annex had as the main objective to set up an aerodynamic data base with experimental results from detailed rotor measurements. The participants in Annex XIV were the five different research
1) To investigate whether the commenly used assumption about Gaussian (normally distributed) turbulence is valid, and possible consequenses of deviations from Gaussianity on load calculations, that
This project has compiled data to allow the Danish manufacturers of wind turbines and blades to improve their knowledge of double stall. On the basis of the double stall difficulties different types
In an earlier research project competitive and cost effective wind turbine foundations in steel were developed. One of the developed foundation types was the mono pile. The present project comprises a
The main result of the investigation is a new developed method to identify the effective damping for the edgewise blade mode shape for wind turbines. The method consists of an exciter mechanisms which