A number of instruments, Internet, media campaigns, boxes displaying electricity prices (SEE1) and spot contract has been tested for households to shift their electricity consumption to times when
The pier-based Wave Star Energy test system is now ready for installation at Roshage pier in Hanstholm. For security reasons, the unit was moved into open waters west of the pier. A high footbridge
The goal of the project is to develop, test, validate and evaluate a novel control architechture for optimised operation and seamless integration of micro CHP based on a generic virtual plant (VPP)
The project united a wide circle of scientists, experts and industrial partners with varying competences and specific experience to hear their visions for how Denmark should develop new long-term
Wave energy test is extended due to an unexpected stop caused by the sinking of the float (due to corrosion). The test is continued in order to obtain sufficient long period of performance data. The
The purpose of this research project has been to develope and test equivalent models of district heating (DH) systems with regard to on-line optimization of the operational costs of the complete