If the overall energy policy targets shall be achieved there is a basic need for increased integration and coordination of renewable energy production facilities into the electric power system. More
The project is a contribution to the national strategy evolving a dynamic and flexible electrical system with wind as the energy source. The key to the future exploiting of excess energy, is to
The objective of the project is to make a 24 m long 1:10 scale version of a Leancon wave power machine that uses airflows created by a wave moving up and down a tube. The project is based on a
The project aims at optimising Wave Star wave machine production from irregular waves through sophisticated control of the back pressure in the hydraulic system in each floater. The system is being
Through a combination of historical analysis, case studies and action research, the research alliance will analyse the roles of socio-technical experiments, creation and utilisation of ''windows of
The project develops a number of new concepts and intelligent approaches for a modern power system which includes renewable energy, storage units, distributed generation, plug-in hybrid electric
The project gathers international research communities to develop design tools and a common design basis for wave power facilities to make them more competitive. The aim is to develop a wave-to-wire
Grid connection and electricity production optimisation from a 500 kW Wave Star wave power unit located at Horns Rev. The project is closely linked to project 10239. If the project achieves the
The project deals with a new idea where water from a nearby reservoir - sea, river or lake - via a pump/motor pressurizes a closed underground membrane, meaning that excessive electrical energy is
The project studies the possibilities of introducing flexible electricity consumption and regulating power among Danish industrial customers though price and control signals from the electricity
The overall purpose of the consortium is to gather research institutions and major industry enterprises which together can cover all stages from research through concept and technology development to
The project explores the possibilities for a combination of wind power and a large heat pump for heat production in the district heating system of Århus. The environmental and economic impact – for
Incineration plants may optimize their participation in the electricity spot market and balancing markets by actively and fast bypassing the steam from the steam turbine. The possibility of this is
The starting point for this project is that today the Danish turbines are NOT participating in the electricity system balancing tasks. As an alternative to this present situation we will in this
Project results are very focused on the results generated through interviews with power plants, and its conclusion must be said to be interesting for both power system actors in general, but
A number of instruments, Internet, media campaigns, boxes displaying electricity prices (SEE1) and spot contract has been tested for households to shift their electricity consumption to times when
The pier-based Wave Star Energy test system is now ready for installation at Roshage pier in Hanstholm. For security reasons, the unit was moved into open waters west of the pier. A high footbridge
The goal of the project is to develop, test, validate and evaluate a novel control architechture for optimised operation and seamless integration of micro CHP based on a generic virtual plant (VPP)
The project united a wide circle of scientists, experts and industrial partners with varying competences and specific experience to hear their visions for how Denmark should develop new long-term