The goal of this project is to perform a trial installation of a full-scale prototype of a suction bucket for wind turbine jacket foundations. The installation is performed at an offshore site near
One of the greatest challenges today is the transformation of the energy system into a more market-based flexible and integrated system, which cost-effectively can integrate renewable energy. The
Standardization work with the aim to find common standards for: Inductive charging is a new method for charging EV,s. There´s no commercial available products. Thereis a need for standardization. V2G
The project will examine how concrete technology can be applied to large offshore wave energy devices in this case Wave Dragon and KNSwing. The study will examine solutions such as ordinary reinforced
Reduction of the cost for installaion of WTG towers with 50% at the same time supporting installation for even larger WTG and tower sizes in the future