The objective of the CooCE project is to establish biotechnological processes, for converting CO2 into upgraded biofuels (biomethane) for on-site hybrid energy storage and value-added platform
Project Greensand Phase 2 aims to provide the necessary insight for subsequent storage capacity of 1⁄2-11⁄2 mtpa of CO2 by 2025 in the depleted Nini Field, Danish North Sea.
New PV module and inverter technology replace old well-known solutions potentially introducing new failure modes. To mitigate such risk factors and support continued deployment of utility scale PV
The project deals with participation in the IEA SHC Task on ‘Efficient Solar District Heating Systems’. The Technical University of Denmark, PlanEnergi, Aalborg CSP A/S and Heliac ApS will jointly
Project FSSE aims to develop a concentrated solar capture (CSP) system with storage and a high temperature Organic Rankine Cycle Unit (ORC) that can be utilized on demand to produce carbon neutral
The project involves the development and maturement of a drone charging station and a drone system. The combined system should then be capable of conducting autonomous wind turbine inspections and
The objective is to develop, test and demonstrate new hybrid low temperature district energy solutions with local use of renewable energy sources. The project is carried out with the aim of conversion
The aim of the UnitSun project is to develop the worlds most advanced prefabricated PV integrated façade system utilizing all the benefits of the prefabrication approach to the construction market for
LERCat enables leading edge roughness (LER) repairs of wind turbine blades at the right time, yielding a 1 bn DKK/year gain across the partners’ turbine fleets. This is achieved by establishing an
Fatigue of fiber rope is crane applications is not well established, why extensive full-scale testing is currently required for using fiber ropes in crane applications. The main objective of this
The purpose of this task is to support application-oriented development of innovative compact thermal energy storage. Close collaboration between material scientists and component and system design
The project aims to lead Subtask C New and existing buildings blocks/communities within the IEA Task 66 project Solar Energy Buildings. The focus of subtask C is on buildings located in district
The purpose of the project is to develop and demonstrate the electrical activation of clay as part of the manufacturing of cement through a joint undertaking between the private companies FLSmidth
The main objective of the project is to contribute to the international cooperation and knowledge sharing around the very important and current topic of wind integration into the power systems via the
This project aims to enhance both the international visibility and the global application of Danish research on the transition to a sustainable energy future. It will help to keep the Danish wind
The aim with the project is to support the participation of DTU Wind Energy in the new IEA Task 47 “Innovative aerodynamic experiments and simulations on wind turbines in turbulent inflow”. By this
Develop and demonstrate an innovative system concept that significantly reduces consumption of lubricant oil (40-60%) as well as fuel (up to 2%) on large cargo vessels powered by two-stroke engines.
De Nationale Geologiske Undersøgelser for Danmark og Grønland
EUDP
2021
2024
The project SHARP Storage aims to accelerate safe and cost-efficient CO2 storage in offshore geological formations, by developing: 1) tools to assess the risk of gas leakage or induced seismicity at
The purpose of the BetterLiBs project is to improve the performance, safety, and duration of Lithium-ion Batteries (LiBs) by developing electrolyte formulations that use novel zwitterionic monomers