De Nationale Geologiske Undersøgelser for Danmark og Grønland
EFP
2000
2001
More than 4,700 cuttings samples from the pre-Upper Cretaceous succession in 33 wells widely distributed in the Danish Basin and Fennoscandian Border Zone have been analysed (TOC determination and
De Nationale Geologiske Undersøgelser for Danmark og Grønland
EFP
2000
2002
Channel sandstones of Paleocene age have been identified as a hydrocarbon reservoir in the area east of the Central Graben in the Danish North Sea sector.
The project work comprised seismic mapping and analysis of sedimentary processes, compilation of stratigraphic, thermal paleobathymetric and lithologic data from wells, thermal and tectonic
The aim of the project has been to single out energy solutions that have a significant energy and environmental influence as well as an acceptable economy in connection with renovation and urban
A key result from the analysis is a strong interdependence between an emission quota and a green certificate quota. Empirical studies support the theoretical finding that for certain quota levels, a
This pre-project contributes to the development of future systems for room heating and production/distribution of domestic hot water. Focus is on systems having the lowest possible environmental
Discussion of the most important results from Danish and Nordic projects, including conversion of vehicles to natural gas: Conversion of engines; Control system; Refuelling; Safety aspects
Residential energy consumption varies both with the building and its inhabitants. Previous research projects have either focused on technical or on social explanations for variations in energy
There is a great need for the development of new building envelope constructions with more insulation and less thermal bridges to comply with the expected new increased demands. This development work
KORA, Det Nationale Institut for Kommuners og Regioners Analyse og Forskning
EFP
2000
2006
The fact that Danish energy taxes are so extreme implies that an EU tax harmonisation might have severe effects for the Danish natural gas market. By applying a general equilibrium model, ENERGAS, we
This project is phase 3 of the Danish contribution to the international project IEA-ECBCS Annex 35: HybVent - Control Strategies for Hybrid Ventilation in New and Retrofitted Office Buildings.
KORA, Det Nationale Institut for Kommuners og Regioners Analyse og Forskning
EFP
2000
2003
The project analyses differences and similarities in the tasks and the organisational design of the regulatory bodies responsible for the regulation of the liberalised electricity market.
The project is a part of IEA SH&C Task 23 'Optimization of Solar Energy Use in Large Buildings'. The objective is to ensure the most appropriate use of solar energy in building projects, to optimise
The design with world record low loss of 0.6 W/m at 2 kArms was transfered to a 30 m long cable. These conductors are bendable, and the manufacturing capacity in the experimental plant was extended to
The overall goal of this project has been to provide the knowledge and the understanding that can lead to an increased efficiency for ac/dc power systems complying with EN61000-3-2 in wide input range
The general objective of this research project is to research children's roles and possibilities for taking action in the energy area. The project deals With energy related education (EE) - focusing
The overall objective of the development plan is to construct instrumentation for internal on-line inspection of offshore gas pipelines for Burial, Free Spanning and loss of concrete weight coating.