The object of this project was to study whether the energy consumption for office building cooling can be reduced by using night-cooling in a way that prevents the discomfort of too low morning
The project group measured various conventional and innovative system solutions for heat pump systems to be able to suggest initiatives aimed at increasing system quality and improve the endusers’
The in the EFP 2002 project were related to the development of a 3G cell with a metal suport of ferritic stainless steel and with stability towards redox and thermal cycling.
The object was to contribute to an international development of methods for a joint evaluation and optimization of the thermal and solar properties of windows. The project was a basis for Danish
The activities in the project were: Cell test under extreme conditions, development and analysis of contacting, stability towards redox and thermal cycling, improvements of methods, and development
This Ph.D. project presents a thorough analysis of the so called SICAM - SIngle Converter stage AMplifier approach to building direct energy conversion audio power amplifiers.
The project established a basis of calculation and a practical basis for optimum choice of solar shading and integrated control strategies for both new building and renovation of office, commercial