The project was in two parts: 1) Evaluation of ventilation needs in dwellings and 2) Development of a computer model for calculation of transient hygrothermal conditions of indoor spaces and building
The objective of the programme is to contribute to a continuous, efficient and target-group oriented dissemination of the results of the research programme: Use of Energy in Buildings.
The purpose of the schedule-project is primarily to delimit and qualify the application for the main project and thus contribute to make a more accurate pricture of the perspectives by carrying out a
The project included the following milestones: 1) Wind tunnel measurements on a NACA 63-415 airfoil with a modified leading edge. 2) Detailed verification of 3D Computational Fluids Dynamics (CFD)
The project will contribute to the basis for connecting large wind farms to power transmission grids regarding voltage quality and power system stability.
On short term the aim with this project is to collect and analyse knowledge about wind and sea, to make it possible to make the tenders for the first offshore wind farms ultimo 1999. In finalised form
The goal was to get optimum benefits of the wind farm technically and financial. The better information about the wind farm status and the better forecast of the production the better prize you get
Tech-wise A/S has conducted a life cycle assessment of a 2 MW offshore wind turbine. A life cycle assessment (LCA), also known as a cradle to grave analysis, is an inventory of all environmental