Fatigue of fiber rope is crane applications is not well established, why extensive full-scale testing is currently required for using fiber ropes in crane applications. The main objective of this
LERCat enables leading edge roughness (LER) repairs of wind turbine blades at the right time, yielding a 1 bn DKK/year gain across the partners’ turbine fleets. This is achieved by establishing an
Project Greensand Phase 2 aims to provide the necessary insight for subsequent storage capacity of 1⁄2-11⁄2 mtpa of CO2 by 2025 in the depleted Nini Field, Danish North Sea.
Project COLLATE is focusing on developing/ optimizing methods, competencies, and equipment for analysis and simulation related to CCUS. The overall aim of the project is to support the growing CCUS
The purpose of the project is to develop and demonstrate the electrical activation of clay as part of the manufacturing of cement through a joint undertaking between the private companies FLSmidth
The project involves the development and maturement of a drone charging station and a drone system. The combined system should then be capable of conducting autonomous wind turbine inspections and
The purpose of the project is to model and optimise complete and integrated renewable energy parks, meaning parks with multiple types of electricity production and storage, conversion into heat
Managing offshore corrosion is a subject that is heavily regulated and combined with several industry standards that must be followed to ensure the structure integrity of the assets. Yet, whilst, and
The aim of this project is to bring the Estech carbon capture technology, based on an electrolytic process, from a successful pilot scale to demonstration scale, demonstrating that the technology is
CO2 will be a key resource in the green transition for two main reasons; 1) to carbon-offset hard-to-decarbonize sectors to reach carbon neutrality in 2050, and 2) to ensure the production of carbon
The purpose of the project is to cover costs for travelling, accommodation and time consumption in connection with participation in and reporting from ECES ExCo meetings in the period 01.01.2022-31.12
HOMEY is software solution that will use probabilistic forecasts to optimize the energy management of hybrid renewable power plants. It will enable the portfolio owner to make informed uncertainty
The purpose of IDEA is to establish reference site conditions and wind reference wind farm designs for floating wind turbines. The project follows the international IEA project on wind farm design and
The overall objective of this project is to further adapt, improve and expand the existing operational tracking technology that Claviate has developed to cover the entire onshore wind turbine
We aim to demonstrate that a radically new blade technology combining jointed modular blades with advanced tips made with additive manufacturing can enable increased rotor sizes by up to 20% and lead
The objective of this project is to develop, design, build, test, optimize and commission FPPs first full-scale wave PTO system. The resulting PTO design will be used to build four identical PTO units
The goal of the project is to develop a barge to jack-up vessel loading technology, which can operate in wavw height of 2.5 m, and that will increase the operation window significantly.
The first purpose is to optimize and demonstrate Exowave wave energy concept in a coastal offshore environment, where the produced seawater under high pressure is led ashore and converted to fresh
The project aims to prove that depleted oil and gas fields in the Danish North Sea can be utilized for safe, long-term carbon storage. The project also aims to show that due to the existence of large