This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
The present R and D will be used to build a 1:10 scale model of a single AquaBuOY and test and measure its performance in a range of sea conditions at the testsite in Nissum Bredning on 5 meters deep