The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
A considerable amount of power is used for pressurizing industrial processes such as fermentation processes. This project is aiming of recover power in an economical attractive way by utilizing the
Weptos A/S receives the award "Årets bedste ForskEL projekt 2012" for best energy research project awarded by Energinet.DK. The award was given to Weptos A/S for an excellent and professionally
Pre-study to design and demonstrate, in small scale, cost effective solutions for 3 commonly identified challenges in the wave power industry, which typically involves floating devices. High efficient
This project supports an improved practice on public participation in infrastructure planning. The project has point of departure in Energinet.dk's planning and uses Danish experiences to develop and
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
Based on an interest of Energinet.dk, the aim of the project is to develop procedures and criteria for integrating environmental concerns in the administration of the ForskEL-programme. Through
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building
The goal for this demonstration project to undergo an independent validation of wave energy machine "Rolling Upright" in the wave tank under controlled conditions, and in doing so have developed a
Wave energy, Lever Operated Pivoting Float LOPF, study of new taut moored buoy concept with direct electrical output. It will cover: Basic static theoretical optimisation of LOPF concept, design of
Traditional Comressed Air Energy Storage (CAES) is seen as one of the most cost effective technologies for the bulk energy storage in the future flexible grid. The project will investigate the
The project will evaluate the potential of reducing harm caused by emission from gas fired engine based CHP plants. This is done by combining measurements on engines at different engine setting with
This project seeks to demonstrate the methane reduction at gas engine CHP plants is possibel with technology previosly used on large dual fuel engines. Methane emission from gas engines raise the
The purpose of the project is improve the efficiency of Power Take off systems for Wave Energy Converters, by analysing and optimizing a new PTO-system with multiple pressure lines. This includes