This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
A complete up-scaled version of BioSynergi Process' air-staged gasification-CHP system (300 kW electricity / 750 kJ /s of heat) is ready to start test operation in autumn 2014.The project covers the
In the BIPV Quality Cities project the total amount of PV systems with special focus on BIPV Quality, Solar Watch online monitoring and a combined focus electricity savings will amount to 3.850 kWp.
The main purpose of the planned Phase III (PVIB-III) is establishment of 1,5 – 2 MW of additional capacity primarily in terms of a large utility scale PV power plant of at least 1,5 MW. Thus very
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the