The purpose of this project is to implement the next phase in the Exowave strategy, which is to be able to establish a 250 MW wave power plant together with an offshore wind farm before 2030 in Danish
The purpose of this project is to make Crestwing completely ready for its first commercially viable device. With the final demonstration of Crestwing’s 30-meter, 65 tons prototype “Tordenskiold”, the
The objective is to develop a prototype design of a wave power converter based on the Point absorber system AquaBuOY in cooperation between RAMBOLL and Aqua Energy.