Weptos A/S receives the award "Årets bedste ForskEL projekt 2012" for best energy research project awarded by Energinet.DK. The award was given to Weptos A/S for an excellent and professionally
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the
Pre-study to design and demonstrate, in small scale, cost effective solutions for 3 commonly identified challenges in the wave power industry, which typically involves floating devices. High efficient
The objective for Partnership for Wavepower Roadmaps are to consolidate and combine the Danish Wave Developers common efforts and produce plans to achieve common goals for Anchor systems, Power
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
DanWEC Fonden
Green Labs DK
2013
2013
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building