The purpose of this project is to implement the next phase in the Exowave strategy, which is to be able to establish a 250 MW wave power plant together with an offshore wind farm before 2030 in Danish
The purpose of this project is to make Crestwing completely ready for its first commercially viable device. With the final demonstration of Crestwing’s 30-meter, 65 tons prototype “Tordenskiold”, the
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
DanWEC Fonden
Green Labs DK
2013
2013
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building