The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
The long-term goals of OES are:
1. To assess and establish confidence in the use of Wave Energy Converters
2. To engage and integrate Danish industry in international initiatives
3. To identify
Weptos A/S receives the award "Årets bedste ForskEL projekt 2012" for best energy research project awarded by Energinet.DK. The award was given to Weptos A/S for an excellent and professionally
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the
Pre-study to design and demonstrate, in small scale, cost effective solutions for 3 commonly identified challenges in the wave power industry, which typically involves floating devices. High efficient
The objective for Partnership for Wavepower Roadmaps are to consolidate and combine the Danish Wave Developers common efforts and produce plans to achieve common goals for Anchor systems, Power