The goal of the project is to develop a barge to jack-up vessel loading technology, which can operate in wavw height of 2.5 m, and that will increase the operation window significantly.
WindCal2.0 will develop and demonstrate a nacelle-mounted lidar calibration method where highly accurate lidars replace cup anemometers as the calibration reference and robots automate and speed up
The project develops a drone inspection solution and digital documentation that recognize and categorize surface errors and measure parts of industrial structures with high precision.
As international shipping is a significant greenhouse gas emitter - if counted as a country, it would be on a ca. sixth place of energy-related CO2 emissions - the international maritime organization
An increasing number of wind turbines are reaching end of life and will soon have to be decommissioned. However, wind turbine blades (WTBs) made of glass fiber reinforced thermoset composites are not
The objective is to ensure future large-scale nacelle test facilities are technical and economically feasible for the wind industry. This will be done by further developing and demonstrating R&D Test
The project partners aim to develop and demonstrate a subsea robot, ACOMAR - Auto COmpact MArine growth Remover, which increases atomization of the marine growth removal process on offshore structures
The project purpose is to deliver easily accessible metocean siting data for design and planning anywhere offshore. Through a scalable quality/cost structure ranging from free general data analytics