Efficient heat pumps running on renewable energy can contribute significantly in reducing Danish CO2-emissions. This project extends the knowledge in the field of heat pumps based on magnetic
The building sector can deliver large energy savings, yet lack of user understanding and accept is a limiting factor. UserTEC studies various users’ response to building technologies in order to
The development of new, highly efficient and compact catalysts for diesel vehicles will ensure an improved air quality and create jobs within this, the world’s fastest growing catalyst market.
The objective is to increase the offshore oil & gas production efficiency and ensure a better utilization of the oil recovered at sea by employing the advanced plant-wide control methodology.
It is risky to develop deep oil and gas reservoirs at extreme temperatures and pressures in the Danish North Sea. We try to reduce the technical risks to unlock those abundant energy resources.
Feasibility study of an offshore energy storage facility with integrated renewable energy production (wind, wave and solar). Design geometry is verified and total costs estimated. Earning potential in
The purpose of the project is to carry out detailed planning/engineering and part-implementation of an off-grid renewable energy solution for Livø Island. A previous project has - based on e.g. the
TotalFlex is a demonstration project that intelligently manages flexible consumption and production. This is done by flex-offers from a technical and commercial VPP, which are traded on a marketplace
NEAS ENERGY A/S
ForskEL
2012
2014
The aim is analyzing, developing and demonstrating a smart grid ready Virtual Power Plant controller that includes the complex challenges of large scale demonstration with demand flexibility
This project is focusing on the electricity consumption of the agriculture on Samsø. The agricultures/farms are going to be active players in Smart Grids together with other manufacturing industries
Århus Vand og Spildevand
ForskEL
2012
2014
The purpose of the project is to map and assess the potential for a water utility to adapt current operating practices to respond to the needs of a the electricity system through a flexible demand
During the project there will be developed models, that combines energy efficient perfomance of the indoor climate for three buildings and fitted the electricity spot market's variable prices for the
The project will highlight the causes for that the actual energy consumption in modern office buildings is much larger than expected during the project engineering (planning) and therefor the building
The project will contribute with a more correct calculation of the actual energy consumption for heat pumps and cooling systems in the simulation programme Be10 by designing and implement better
In a PhD studyevaluatedthe use ofthe newly developeddynamicfaçadesystemEnergy Framesin the context ofan EU-fundeddemonstrationproject carried outinsix buildingsin sixnorthern European