The project purpose is to ensure that a large fraction of the potential for mass- and energyintegration can be exploited in industrial process plants. Today a significant fraction of the potentially
It is the purpose of the project to develop and energy efficient 'straightner' ventilation aggregate with an integrated 'chopper' heat exchanger for single-family houses, buildings of flats, offices
One objective of the project is to investigate the possibilities of developing controlled facade inlets at floor-height for natural ventilation by displacement ventilation, which does not result in
The objective of the project's Phase 1 is to evaluate the possibilities of system solutions with thermoactive constructions acting both as heating and cooling system under Danish conditions and with
This project describes a plug-and-play concept for intelligent components in heating installations. Intelligent components differ from traditional components by having 'intelligence' in the form of
The object of this project was to investigate the possibility of replacement of electrical heaters with gas fired burners in the mould flow industry. Different kinds of barriers, why gas is not used
The object of the project is to develop a new treatment process for nitrogen removal, primarily to be used in wastewater treatment in the industry. The deammonification process offers a substational
The subject of this project is a total integration of a switch mode audio power amplifier and an electro dynamic loudspeaker into a single unit using the voice coil of the loudspeaker as an output
Power converters are used in various areas like power supplies, motor drives and for power conversion at energy production systems. The use of Zero-Voltage-Switching in power converters has a strong
Based on the measured consumption's it cannot be concluded that floor-heating systems are less energy economic than combined radiator heating/floor heating systems.
The developed heating concept was based on design comprising two pipes with or without heating fin and a tangential fan mounted in parallel to the pipes.
The goal of the project is to develop the separation concept 'Separation of water through gas hydrates' from the idea stage to a level where we are able to control the process and make the following
The aim of the project is to make detailed calculations of the necessary energy supply for heavy and light floor heating systems in buildings that conforms to the expected thermal requirements of the
Multi-openable glazed facade in a new multi-storey building. The purpose of this project was to demonstrate how new types of glazing and glazed areas can be incorporated in a new multi-storey building
New solutions have been developed for buildings with concrete panels without ribs at window reveals and at horizontal joints, corresponding to concrete panels with an unbroken insulation layer and
The main purpose of phase 3 was to prepare and present the results from the two first phases in a form that can be directly used by the consultant's in the future school-building activities.