The developed heating concept was based on design comprising two pipes with or without heating fin and a tangential fan mounted in parallel to the pipes.
The goal of the project is to develop the separation concept 'Separation of water through gas hydrates' from the idea stage to a level where we are able to control the process and make the following
The aim of the project is to make detailed calculations of the necessary energy supply for heavy and light floor heating systems in buildings that conforms to the expected thermal requirements of the
Multi-openable glazed facade in a new multi-storey building. The purpose of this project was to demonstrate how new types of glazing and glazed areas can be incorporated in a new multi-storey building
New solutions have been developed for buildings with concrete panels without ribs at window reveals and at horizontal joints, corresponding to concrete panels with an unbroken insulation layer and
The main purpose of phase 3 was to prepare and present the results from the two first phases in a form that can be directly used by the consultant's in the future school-building activities.