The barriers so far preventing use of sophisticated, energy-efficient lighting control were analysed and tools developed for selecting optimum system solutions for automatic lighting control in
Lab tests have shown that the need for basic ventilation in foundries can be reduced by removing flue gases as close to the source as possible. These results have subsequently been confirmed by tests
The project group developed a method to characterise the dynamic properties of solar shading in connection with the current window the project group wants to use and not just an old standard window
The project group studied the possibilities of preventing rime formation on cooling and freezing furniture in supermarkets by removing part of the air humidity via air-conditioning systems and by
During the project, a team with special competencies in energy efficiency and sustainable buildings sought to influence clients and advisers in Copenhagen’s Ørestad district to improve project energy
The project has been carried out and has been finalized with a summary report in Danish. Performance tests of new suction hoods have been carried out at F. Junckers Industrier A/S in Køge, Denmark
The object was to contribute to an international development of methods for a joint evaluation and optimization of the thermal and solar properties of windows. The project was a basis for Danish
This Ph.D. project presents a thorough analysis of the so called SICAM - SIngle Converter stage AMplifier approach to building direct energy conversion audio power amplifiers.
The project established a basis of calculation and a practical basis for optimum choice of solar shading and integrated control strategies for both new building and renovation of office, commercial