In the BIPV Quality Cities project the total amount of PV systems with special focus on BIPV Quality, Solar Watch online monitoring and a combined focus electricity savings will amount to 3.850 kWp.
The main purpose of the planned Phase III (PVIB-III) is establishment of 1,5 – 2 MW of additional capacity primarily in terms of a large utility scale PV power plant of at least 1,5 MW. Thus very
This project aims at improving the forecast of wind and waves for storm conditions offshore. We explore coupling strategies for the atmospheric, wave and ocean modeling using WRF (WRF-LES), MIKE 21 SW
The costs of the management of seabed wind farm interaction is high, around one third of the total costs of the foundation of offshore wind farms. The aim of the project is to reduce these costs by
This project focuses on the integration of photovoltaics (PVs) with thermoelectric generators (TEGs) and microchannel heat exchangers (µHX) in two parallel phases: low-thickness solar power systems
The Megavind Partnership´s vision is to maintain and develop Danish position as wind energy hub and home to the world´s leading companies and research institutes. Megavind´s objective is to identify
Interruptions of installation/uninstallation of wind turbine blades due to high wind speed are a huge cost for the wind industry, especially offshore. The objective of this project is to be able to do
The aim is to develop a solar-powered comfort cooling system, where electricity produced by solar cells via a heat pump is converted to air conditioning in the existing ventilation system, via
The proposed EUDP project is realized in cooperation with the housing association, 3B, which will be involved in a large roof renovation project in the Måløv Park housing estate.
The purpose of this project is to validate the technical and commercial potential in a new method to manufacture feedstock for silicon solar cells. The method is expected to generate the same product
The future role of solar thermal in urban environments and in smart renewable energy systems is analysed in this project. Based on economic analysis, strategies and technical solutions as well as
The purpose of this Combined Solar Thermal Demonstration is to commercialize the CSP system, and verify the respective efficiencies of CSP and Flatpanel technology at a variety of temperatures, the
The project aims to develop a PVT module that combines insulation, solar cell and solar panel in integrated building components intended for the renovation of apartment buildings. The building
A unique and dedicated software tool for small and medium size wind turbines - Online WAsP - is proposed to ensure inexpensive but accurate calculations of energy yields, noise impacts and financial
The objective of this project is to establish a novel type of wind load simulator where the true nature of wind can be simulated. The wind load simulator is central part of a new generation of test
The purpose is to develop and demonstrate a solution, an integrated Crane Basket, solving the challenge to get technicians access to blades on installed turbines – on- as offshore, for safe and
Task27 will focus on the research needs for understanding small wind turbines and their performance in environments of high turbulence including the built-environment. The subtasks are: Continue the
The aim of the project is to develop very large self-sustainable PV/PVT modules with associated flashings which can replace existing roofing on larger buildings such as sheds, warehouses, etc
”The New Roof” is a holistic new approach to obtain the multifunctional and energy harvesting roof for renovation and new build. It is developed in an integrated design process aiming at a market
The purpose of the project is to build a pilot installation using a new generation of ultra cost-effective solar modules – SunTubes. The pilot plant will validate the technology towards later