The aim of the PlateCell project is to develop and demonstrate roll-2-roll electrodeposition of thin film photovoltaics based on the earth-abundant and non-toxic, CZTS, semiconductor with at least 8%
The project will be the Danish part of the recently started IEA (International Energy Agency) SHC (Solar Heating & Cooling Programme) Task 64 on Solar Process Heat. The key components of solar heating
The main purpose of the IEA SHC Task is to demonstrate the possibilities regarding deep energy renovation of historic buildings in achieving the lowest possible enerdy demand and thereby CO2 emissions
The overall aim of the project is to develop and test the next generation of direct solar-powered coolers for storing vaccine and other temperature sensitive products such as fish and meat in areas
The purpose of this project is to develop better recommendations for understanding the solar energy resource in energy systems with high degree of renewable energy penetration. This is done as an
The objective is to continue Danish management of IEA SHC Task 57 ”Solar Standards and Certification” until the end of the task period. This task supports international co-operation on improvement and
The aim of the project is - through exchange of international knowledge - to develop and promote solar district heating plants. Denmark is in front in this field and the project gives good
We will develop a complete residential PV system for grid connection, all in one 230 V AC, 50 Hz, 270-350 W module, with substantial testing to realize a system with the required performance of more
The objective of this project was to initiate a new IEA-SHC task for large scale solar heating systems. The aim of the task is to exchange experiences concerning large scale solar heating systems and
Danish lead in new IEA-SHC task for large solar heating systems. - Optimise large scale solar heating systems - focus on design and operation of combined systems including heat pumps and seasonal
The project shall demonstrate a heat pump seasonal storage connected to the upcoming 35.000 m2 solar plant in relation to Donninglund Fjernvarme. EUDP has in 2009 granted 12. mio. kr. to the project
The main objective is to enable the Danish participation in a newly started project within the framework of the IEA-SHC programme (solar heating and cooling). The title of the new task is Task 44
The project Energy efficient prefab. facade- and roof element has as purpose to design, develop and demonstrate an cost effective building element with integrated photovoltaic through the use of pre
Nordisk Folkecenter for Vedvarende Energi
ForskVE
2010
2011
The immediate project purpose is to support an accelerated enlargement of PV plants in Denmark by documentation and demonstration of two household PV plants with intended “lighthouse effect” and to