This main objective of this project is to demonstrate procedures that can quantify the risk of failure, the remaining structural reliability and the maintenance costs upon extending the life of
The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
IEA Wind Task 28” on Social Acceptance of Wind Energy Projects is a working group involving several countries, including the USA, Germany, Denmark, Switzerland, Japan, Ireland, Italy and the
Because these hours are incoherent and unpredictable, a constant availability of power is imperative and as a result the generator has to be operating around the clock. Thus Power Pack will contribute
A wind turbine power converter includes power modules mounted on cooling plates, which cool the component. The heat is transferred to the ambient by use of a water circuit and an air cooler. The
The long-term goals of OES are:
1. To assess and establish confidence in the use of Wave Energy Converters
2. To engage and integrate Danish industry in international initiatives
3. To identify
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2018 through participation as Alternate member in the Agreement Steering
The project will design and test innovative blade tips for wind turbines which can increase the existing rotor size, producing up to 8% more energy per year, while regulating loads in a smart way.
Every wind farm project requires accurate resource assessments to evaluate the energy yield and profitability, but for projects in hilly, mountainous or forested areas the measurement campaigns can be
Small cracks in wind turbine bearings are responsible for some of the most expensive wind turbine failures. Today, there are no certain methods of preventing the cracks, but a new project led by DTU
The annex will give the participants an overview of the technical and environmental assessment challenges encountered in offshore applications and help them to understand the areas of further R and D
The project included the second phase of a process aimed at establishing a platform for wind turbine simulation as a prerequisite for advanced electrical design and optimisation.
The aim of the project is to develop, verify and implement a detailed physical model for the wind field in a wind farm. The model will allow for detailed aeroelastic simulation of wind turbines sited
The overall objective of the project is to ensure the development of an aetoelastic design complex, which can create the basis for the nest generation of wind turbines and make new design trends
This project, HAVDIM2004, aimed primarily at analysing already accessible measurement data from the two Danish offshore wind farms Horns Rev 1 and Nysted Offshore Wind Farm. The project focused on
A scale 1:40 Wave Star wave energy converter has gone through more than 600 different wave tests in order to map the characteristics of the machine and optimize the annual energy production in a
The project generated results in selected areas of flexible multibody wind turbine modelling. Monte Carlo statistical response simulations and failure probabilities require significantly reduced