A fossil free energy system requires great flexibility in the grid. Lithium batteries, which have in recent years undergone a great development in regards to price and performance, can add such
EV-STEP's overall goal is the long term strategic analysis of the energy, economic and environmental dimensions of the different kinds of electric vehicles. EV-STEP is a two year project funded under
COMPETT explores functionalities and potential barriers for the wide range of electrified vehicles that are in use today. The project seeks to develop an economic model showing the costs and benefits
NEMO seeks to develop a simulation and optimization tool suite on the impact of a large volume of electric vehicles (EV) on the power grid, based on existing tools of three of the project partners
NEMO seeks to develop a simulation and optimization tool suite on the impact of a large volume of electric vehicles (EV) on the power grid, based on existing tools of three of the project partners
NEMO seeks to develop a simulation and optimization tool suite on the impact of a large volume of electric vehicles (EV) on the power grid, based on existing tools of three of the project partners
SELECT examines the actual state and expected development of EV in commercial transport in different European countries and will derive recommendations addressing the broad range of stakeholders
SELECT examines the actual state and expected development of EV in commercial transport in different European countries and will derive recommendations addressing the broad range of stakeholders
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of
The project has generally aim to support Denmark´s participation in the “IEA Wind Energy R & D Implementing Agreement” in 2013 through participation in the Agreement Steering Committee (“Executive
Currently, individual wind turbines can estimate their possible power of during down-regulation. For large offshore wind power plants, the sum of those signals is larger than the possible power of the
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The overall objective of the project is to develop a cost-efficient Lidar wind sensor to be integrated on individual wind turbine in order to maximize power production and minimize dynamic load on the