Building on the results achieved in a first EUDP project, the purpose of this project is to finalise the development and testing of the technologies needed to produce extra – tall 3D printed wind
Power Curve, the Technical University of Denmark and Statkraft collaborate in order to develop a trailing edge serration product for wind turbine blades that offers increased noise reduction fea-tures
The purpose of the Thunderbolt project is to be able to deliver a fully commercialized service on subscription to the wind energy market after successful project execution, making it possible to
The project is dedicated to enhancing the efficiency and cost-effectiveness of foundation design for offshore structures such as windfarms and energy islands. The envisioned solution involves the
The project allows Floating Power Plant (FPP) to optimise and further develop novel floating wind concepts. The output will be three large demonstration activities and six innovations, including a
Aeromine is a novel, building integrated windenergy system intended to compete with or supplement industrial rooftop solar PV. The EUDP project will improve the understanding of- and demonstrate how
Formålet med projektet er, at have mere pålidelige WTG-vinger i drift med forlænget levetid, sænke OPEX og optimere AEP, gennem anvendelsen af en risikobaseret tilgang. Hvis vingerne kan forblive i
The objective of BLATIGUE-2 is to develop fast and efficient fatigue testing methods for large wind turbine blades, to develop smart equipment to excite the blades under such tests and to increase
The purpose of the project is to increase the liability of blades in operation by installing RTZ Solution. Further, the purpose is to reach higher cost efficiency and higher AEP for the wind turbine
Fatigue of fiber rope is crane applications is not well established, why extensive full-scale testing is currently required for using fiber ropes in crane applications. The main objective of this
LERCat enables leading edge roughness (LER) repairs of wind turbine blades at the right time, yielding a 1 bn DKK/year gain across the partners’ turbine fleets. This is achieved by establishing an
The project involves the development and maturement of a drone charging station and a drone system. The combined system should then be capable of conducting autonomous wind turbine inspections and
Managing offshore corrosion is a subject that is heavily regulated and combined with several industry standards that must be followed to ensure the structure integrity of the assets. Yet, whilst, and
The purpose of IDEA is to establish reference site conditions and wind reference wind farm designs for floating wind turbines. The project follows the international IEA project on wind farm design and
The overall objective of this project is to further adapt, improve and expand the existing operational tracking technology that Claviate has developed to cover the entire onshore wind turbine
We aim to demonstrate that a radically new blade technology combining jointed modular blades with advanced tips made with additive manufacturing can enable increased rotor sizes by up to 20% and lead
The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of
The project has generally aim to support Denmark´s participation in the “IEA Wind Energy R & D Implementing Agreement” in 2013 through participation in the Agreement Steering Committee (“Executive