The objective of BLATIGUE-2 is to develop fast and efficient fatigue testing methods for large wind turbine blades, to develop smart equipment to excite the blades under such tests and to increase
The purpose of the project is to increase the liability of blades in operation by installing RTZ Solution. Further, the purpose is to reach higher cost efficiency and higher AEP for the wind turbine
Fatigue of fiber rope is crane applications is not well established, why extensive full-scale testing is currently required for using fiber ropes in crane applications. The main objective of this
LERCat enables leading edge roughness (LER) repairs of wind turbine blades at the right time, yielding a 1 bn DKK/year gain across the partners’ turbine fleets. This is achieved by establishing an
The project involves the development and maturement of a drone charging station and a drone system. The combined system should then be capable of conducting autonomous wind turbine inspections and
Managing offshore corrosion is a subject that is heavily regulated and combined with several industry standards that must be followed to ensure the structure integrity of the assets. Yet, whilst, and
The purpose of IDEA is to establish reference site conditions and wind reference wind farm designs for floating wind turbines. The project follows the international IEA project on wind farm design and
The overall objective of this project is to further adapt, improve and expand the existing operational tracking technology that Claviate has developed to cover the entire onshore wind turbine
We aim to demonstrate that a radically new blade technology combining jointed modular blades with advanced tips made with additive manufacturing can enable increased rotor sizes by up to 20% and lead
The PossPOW project developed a verified real-time power curve for offshore wind power plants, also applicable under downregulation. Concert will enrich this to a full asset optimisation package
NetVind aims toward the green transition in Denmark, by rethinking the way of using wind power plants in distribution systems. NetVind analyses and demonstrates in a large experimental facility, which
The NSON-DK project is the Danish part of a North Sea Offshore Network (NSON) project umbrella with research participants from UK, Germany, Norway and Netherlands. The purpose is to study the impact
The objective of BLATIGUE is to develop fast and efficient fatigue test methods for large wind turbine blades and to develop equipment to excite the blades under such tests.
Turbines are designed to change its direction as a change in the wind direction occurs, and partial wear occurs when the windmill actively yaws back and forth in a too narrow spectrum for a long time
The aim of this project is to proof the iSpin measurement capability and robustness on a broad scale. The robustness shall be proven based on measurements of a total of around 90 WTGs located in 9
The objective of the project is to develop an offshore self-hoisting crane (OSHC) based on the principles of Liftra Self Hoisting Crane (LSHC). The OSHC must be operable from a floating platform
The aim of this project is to expand the detecation capabilities of the current Windar lidar systems to include a robust wake detection system under varying atmospheric conditions .Develop different
The objective of IMPACT is to develop computationally efficient and accurate fatigue lifetime prediction methods for adhesive connections in large utility wind turbine roto blades.