The objective is to disseminate information about Danish publicly funded R&D projects in
Denmark and internationally. This is achieved through the database DENP. With the creation of the
Danish energy
TORBEN SKØTT
EUDP
2012
2014
This project has to improve the communication between researchers and practicians, provide investors to projects, show which projects may be good business and finally point out technical subjects for
The overall objective of this IEA-task is to compile an extensive volume of information relative to the implementation of various alternative fuels within the European maritime sector and recommend
Participation of the Danish delegate to the international energy collaboration, to the annual meeting of the IEA-EOR Executive Committee. (International Energy Agency- Enhanced Oil Recovery).
The ''Smart Water'' injection strategy is based on laboratory experimental observations that variation of the injected water salinity and of its ion balance may result in large additional recovery
De Nationale Geologiske Undersøgelser for Danmark og Grønland
EUDP
2011
2014
The objective is to pave the way for a wider application in Denmark of heat pump systems based on closed loop boreholes - a technology with potential for CO2 reductions and energy efficiency. The
Traditional Comressed Air Energy Storage (CAES) is seen as one of the most cost effective technologies for the bulk energy storage in the future flexible grid. The project will investigate the
The project will evaluate the potential of reducing harm caused by emission from gas fired engine based CHP plants. This is done by combining measurements on engines at different engine setting with
This project seeks to demonstrate the methane reduction at gas engine CHP plants is possibel with technology previosly used on large dual fuel engines. Methane emission from gas engines raise the
This project will identify and analyze the primary causes for formation particles in exhaust gas from gas engines at CHP plants. The project will be performed in close co-operation with manufacturers
Based on the results achieved in Phase 1 and 2 (the practical experiments and theoretical calculations of a 5x5 m energy membrane), this project shall further clarify and assess the technical and