The goal of the project is to collect, promote, and communicate the knowledge of pyrolysis and related thermal conversion processes for production of fuels and chemicals from biomass.
The aim of this preliminary project has been to develop a 'self-learning' district heating meter using a neural network to control consumer heating installations. Two different neural network
The objectives of this research project are to reduce energy consumption of electrostatic precipitators and to improve precipitation efficiency, particularly for small dust particles.
Use of Drag Reducing Additives, DRA, in circulating district heating water can reduce network pressure losses significantly. However, a serious obstacle to the practical implementation of this concept
The aim leading to the LT-CFB concept is to create better access for the efficient, clean and economic utilization of bio-fuels and waste products having a high content of slag forming and/or
The objective of this research project is to improve the electric energy efficiency of biomass fired boilers (specifically straw). The main focus of the project is on deposit formation on walls and
The energy consumption by the actual ploughing can be separated into two essential main elements: The power needed to break the soil; Friction between the soil and the various parts of the plough. In
The development primarily consists of improved computational tools, combination of existing processes as well as introducing new methods and processes.
The background for the project is the fact that it has become technically and economically feasible to use variable speed control of all active components (compressors, fans, pumps) in a refrigeration
The solution proposed in this project is to modify the cylindrical air gap of an electric motor by applying a non-linear axial profile (called Shark profile).
The main goal of ECBCS Annex 36 is to provide the educational building decision-makers with sufficient data, information and tools to improve their learning and teaching environments by improving the
The project has demonstrated a building integrated ventilation system with the ducts system installed outside the facade. The air ducts are installed in a solar tower parallel to the staircases in the