Ørsted A/S
ForskEL
2005
2011
The purpose of this project was to develop materials with higher resistance to the corrosive elements, in order to reduce the cost of maintenance, increase the availability, and increase the
The objective was to assess the potential of addition of sulphur with a view to emission control in connection with natural gas-firing in swirl-stabilised diffusion burner and in engines and, if
The objective of the overall project was to develop a system for online optimisation of waste incineration. Phase 2 worked to design a measuring programme at Haderslev CHP plant to determine the key
The project demonstrated and documented the RECCAT system in full scale on the 1.5 MW Rolls Royce engine of Rask Mølle heating plant. Too small reactor size entailed reduced ability to maintain the
The PSO Project 5820 aimed to study deposit-induced Cl corrosion under well-controlled laboratory conditions, simulating the conditions in biomass-fired boilers. This was done by exposing pieces of
The aim of this project is to implement an online volatile fatty acids (VFA) sensor developed at E and R DTU for monitoring, control and optimization of the biogas process.
Under the IEA-ETDE (Energy Technology Data Exchange) agreement a common database is produced containing descriptions of journal articles, reports, books, conference papers etc. published in the member
The aim of the project is to utilize Denmark's position and to develop international collaborations in order to optimize four major steps in the Danish Bioethanol concept.
The gasproduction from liquid manure in terms of volume is low and the economy of the plants are often very dependent on the supply of easy degradable waste products and at the moment the extension of
The main objective of the project was to improve biogas production from manures. This objective was addressed by investigating: 1) the effect of different reactor configurations, 2) operational
KORA, Det Nationale Institut for Kommuners og Regioners Analyse og Forskning
EFP
2004
2010
The aim of the project is the quantitative evaluation of the effect of Danish Energy Labelling Scheme in 1998-2001 and Building regulations BR77, BR82, BR-S85 and BR98 on natural gas consumption. The
The purpose of the project is to clarify advantages and disadvantages, potentials and possible problems when burning or gasifying the separated fibre fraction from biogas production, before the fibre
Measures are already being taken to reduce further risk of bottle-necking by changing the conditions under which the decentralized power stations operate and amending the law that forbids the use of
1) Analyse the country-level, regional and global potential of bioenergy, forestation, and other biomass-based mitigation strategies, including implications for the atmospheric CO2 concentration and
Objective: To synthesise and transfer to stakeholders important international knowledge and new technical information concerning conventional forestry systems for sustainable production of bioenergy.
The aim of this project is to promote research results within bioenergy to researchers, advisers, factories and public authorities among others. The promotion is to be done through a newsletter, six
Fødevareøkonomisk Institut. Jordbrugets Driftsøkonomi - KU
EFP
2004
2006
The main objective of the project was the identification and analysis of new technical concepts for centralized biogas plants, which would make them less dependant on organic waste supplies, and this