As a follow-up to PV Island Bornholm, Phase I project targeting implementation of 1 MWp of PV on the island of Bornholm, it is proposed to establish a phase II targeting an additional 1 MWp. The
In the proposed PV-Boost-2015 project coordinated by Gate 21 it is intended to realise 700 kWp innovative BIPV systems in zero energy and low energy class1 and 0 buildings in 7 dif-ferent cities in
The focus of this effort is the reduction of uncertainties in offshore wind turbine design, by complete measurement of the effects of interactions of a modern turbine structure (located on the Walney
The objective of the Light Rotor project is to develop the basis for design of wind turbine blades for use on the order of 10MW rotors with lower weight, tailored aeroelastic response and optimized
The purpose is to develop and validate computer codes related to response simulation on offshore wind turbines and their substructures. It is carried out within the framework of lEA Annex 30
The goal is to develop a range of intelligent chargers for electrical vehicles. Hereby is it possible to enhance the usage of renewable energy production.
We will develop a complete residential PV system for grid connection, all in one 230 V AC, 50 Hz, 270-350 W module, with substantial testing to realize a system with the required performance of more
Megavind continues to support and consolidate the stronghold of the Danish wind industry through a focused and strategic vector apporach to validation, demonstration, research and education. Megavid
The objective of this project was to initiate a new IEA-SHC task for large scale solar heating systems. The aim of the task is to exchange experiences concerning large scale solar heating systems and
Danish lead in new IEA-SHC task for large solar heating systems. - Optimise large scale solar heating systems - focus on design and operation of combined systems including heat pumps and seasonal
The project shall demonstrate a heat pump seasonal storage connected to the upcoming 35.000 m2 solar plant in relation to Donninglund Fjernvarme. EUDP has in 2009 granted 12. mio. kr. to the project
The overall objective of the project is to develop a prototype trailing edge flap system for a wind turbine blade. From its present stage of proven functionality under laboratory conditions it is
The objective of this project is to model and explore the influence of atmospheric stability conditions on structural loading and production losses of wind turbines operating in wind farm conditions
The purpose of the project is to introduce and implement a new dynamic data analysis method, DDA, in the Danish wind industry. This method is based on fast measured data rather than traditional 10min
The main objective is to enable the Danish participation in a newly started project within the framework of the IEA-SHC programme (solar heating and cooling). The title of the new task is Task 44
The purpose of the project is to strengthen the Danish contribution to the International Energy Agency project 'IEA Annex 30: Offshore Comparison of Dynamic Computer Codes and Models' with an
The project Energy efficient prefab. facade- and roof element has as purpose to design, develop and demonstrate an cost effective building element with integrated photovoltaic through the use of pre
The purpose of the projekct is to duce cost of energy in the design, production, transport, installation and maintenance of monopile foundations for large offshore wind turbines. The primary goal is
The aim of the project is to evaluate and compare – technically and economically – options for using electricity storage to provide short term (seconds to an hour) system services at transmission