The project objective is to test, verify and document the radar control installation aiming at defining the minimum requirements for this type of system capability. The project will also investigate
The project will demonstrate that solar energy modules can transform an old multistory residential building into a beautiful self- sufficient architectural building getting free renewable electrical
The objective of the project is on basis of participation in the IEA Task 29 MeXNext III to utilize the results from a new wind tunnel measurement campaign on a 4.5m rotor (summer 2014) for validation
Seagar aims to develop and demonstrate a device that enables bolts in wind turbine towers to be tightened automatically. The robot moves from bolt to bolt, tightens each bolt and documents all
In this project, a standalone PV reflector tower in which a reflector enhances the solar radiation on a vertical bifacial PV panel, is developed. The tower will supply power to measurements for road
The objective of the project is to ensure that Danish research institutions and companies active with development, installation and operation of Photovoltaic systems, are informed on the latest
Goals:
Improve knowledge of the market potential for Small Wind. Identify industrial business plans for
manufacturing and marketing. Improve knowledge of export by means of practical training and
issu
´IEA SHC Task 51: Solar Energy in Urban Planning' will develop strategies, methods, tools and good examples to facilitate the increased use of solar energy in urban areas. As part of the Danish work
Blade replacement in wind turbines is costly due to the large cranes needed. The Single Blade Exchange without crane system will be able to do the replacement of blades without a mobile crane and with
LM WIND POWER A/S
Innovationsfonden
2015
2018
The project OPTI_MADE_BLADE has as its goal to develop and commercialize a new concept for procuction of large (>70m) wings for offshore windmills.
Innovationsfonden
2014
2018
The project INNOMILL works towards development of a more profitable and ultra flexible high precision system for fabrication of big elements in the wind mill industry. The goal is to reduce the cost
To be able to install wind turbines and for these to operate in Denmark or in Danish waters, they must be certified and serviced in accordance with the technical certification scheme for wind turbines
The main objective of this project is to advance the overall accuracy of the existing aero-hydroservo-
elastic computer codes related to offshore wind turbines and their substructures. This is
achieve
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2015 through participation in the Agreement Steering Committee ("Executive
In the BIPV Quality Cities project the total amount of PV systems with special focus on BIPV Quality, Solar Watch online monitoring and a combined focus electricity savings will amount to 3.850 kWp.
The main purpose of the planned Phase III (PVIB-III) is establishment of 1,5 – 2 MW of additional capacity primarily in terms of a large utility scale PV power plant of at least 1,5 MW. Thus very
This project aims at improving the forecast of wind and waves for storm conditions offshore. We explore coupling strategies for the atmospheric, wave and ocean modeling using WRF (WRF-LES), MIKE 21 SW
The costs of the management of seabed wind farm interaction is high, around one third of the total costs of the foundation of offshore wind farms. The aim of the project is to reduce these costs by
This project focuses on the integration of photovoltaics (PVs) with thermoelectric generators (TEGs) and microchannel heat exchangers (µHX) in two parallel phases: low-thickness solar power systems
The Megavind Partnership´s vision is to maintain and develop Danish position as wind energy hub and home to the world´s leading companies and research institutes. Megavind´s objective is to identify