The Bucket Foundation is a next generation novel foundation concept for offshore wind turbines that is capable of delivering significant reduction in Cost of Energy.
Application of wireless technology as sensors on wind turbine blades will enable design of long, light-weight blades that in combination with advanced controls serve to reduce cost of wind energy.
Superconductivity is a promising technology for decreasing size and price on generators for large wind turbines. Laboratory test are to validate the design basis before a full scale generator is
The objective of this project is to understand inducement and blocking mechanisms of local acceptance of wind power and similar renewable energy technologies. The aim is to adjust or redesign the
To contribute to development of new cold climate technology and stimulate new applications for Danish wind technology through IEA Task 19 through forming the basis for new international standards in
J Lemming Rådgivning
EUDP
2014
2015
The project has generally aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2014 through participation in the Agreement Steering Committee ("Executive
Objective of the project is to design, build and test a cost efficient and reliable wind turbine nacelle utilizing belts instead of a traditional gearbox. The partners will design and partly build a
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
The objective of Task 25 is to analyse and further develop the methodology to assess the impact of wind power on power systems. The Task has established an international forum for exchange of
The project has generally aim to support Denmark´s participation in the “IEA Wind Energy R & D Implementing Agreement” in 2013 through participation in the Agreement Steering Committee (“Executive
Currently, individual wind turbines can estimate their possible power of during down-regulation. For large offshore wind power plants, the sum of those signals is larger than the possible power of the
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The overall objective of the project is to develop a cost-efficient Lidar wind sensor to be integrated on individual wind turbine in order to maximize power production and minimize dynamic load on the
The purpose is to develop and demonstrate methods for cableinstallation, which via improved cable
fabrication and installation can reduce costs for installation of array-, infield- and export cables