Activation and control of Danish houses' heating system will offer an opportunity to improve the utilization of electricity from varying sources like renewable energy in a flexible energy grid. The
The main scope of this project is to establish well-documented and quantified technoeconomic scenarios for grid balancing by cryogenic carbon capture coupled with synthesis of transportation fuels
The main objective of GCFB is to develop a VRFB prototype which cna be demonstrated in the low-voltage grid at a feeder line with aggregated renewable production which causes imbalances in the feeder
This main objective of this project is to demonstrate procedures that can quantify the risk of failure, the remaining structural reliability and the maintenance costs upon extending the life of
It is the aim of BEEST to set forward the innovative steps required to establish highly efficient,
low-cost conversion of electricity to chemicals for large-scale storage of renewable electricity and
SustEnergy aims to develop a dedicated life cycle assessment (LCA) model targeted to assessment of integrated energy technologies. The model is based on the existing LCA model EASETECH developed by
The Annex project aims to increase the knowledge, identify critical aspects and possible solutions concerning the Energy Flexibility that buildings can provide and the means to exploit and control
The future Danish electricity system will be based on renewable energy, calling for large-scale energy storage. This project will store electricity as methane by developing an efficient Power2Gas
The objective of the project is to develop and demonstrate a novel information security product for protecting Industrial Control Systems (ICS), e.g. SCADA systems, against cyber-attacks. The product
The project is to investigate the future integrated energy system from the market perspective and to build proper market mechanism for the wholesale market, short-term market and investment market for
The Cloud Battery Management System (BMS) project will develop cloud based battery data analysis and demonstrate that the use of big data and artificial intelligence can significantly improve the
The objective is to develop the communication process and the tools/methods adequate for the DSO to deploy to avoid that the trade on the electricity markets is not threatening the supply security.
The long-term goals of OES Task 10 are:
1. To assess the accuracy and establish confidence in the use of numerical WEC models
2. To determine a range of validity of existing computational modelling
The COPE project will provide a cost efficient and secure solution for the design and operation of
100% renewable based energy systems with power to heat (P2H) and power to gas (P2G).
IEA Wind Task 28” on Social Acceptance of Wind Energy Projects is a working group involving several countries, including the USA, Germany, Denmark, Switzerland, Japan, Ireland, Italy and the
Because these hours are incoherent and unpredictable, a constant availability of power is imperative and as a result the generator has to be operating around the clock. Thus Power Pack will contribute
The project will improve the understanding among stakeholders - industry, government, nongovernmental organizations, and research - of what policies, institutions, market designs and consumer
A wind turbine power converter includes power modules mounted on cooling plates, which cool the component. The heat is transferred to the ambient by use of a water circuit and an air cooler. The
Wind farm control is a hot topic, to improve operations and integration of wind farms in the grid. With that, the individual wind turbine controllers come into focus again. In PowerKey, we enlarge the