Biomass dust firing constitutes a significant risk due to corrosion of boiler walls and super-heaters. The project exposed corrosion probes in Blok 2 of the Amager Power Station and Avedøre Power
The project aim was to facilitate continued technical development of biomass-fired CHP and communicate the results from the Danish biomass development programme nationally and internationally. The key
NO emission can be reduced by means of two-step combustion in a 20 kW burner firing wood, straw and natural gas. A full-scale boiler produces the highest level of NO in connection with oil firing
This project verified CFD modelling of grate-fired boilers at power stations using straw firing, viz. Ensted Power Plant and Avedøre II. The combustion process was described, and the documentation
Vanadium redox-flow batteries are one of the promising battery technologies. A 15kW/120kWh vanadium battery was installed as part of the SYSLAB facility at Risø DTU. The battery was installed in
The project is published as a ph.d. thesis. The thesis analyses the possible relationship between lifestyle and energy use. The concept of lifestyle has become a key word in understanding the impact
The present continuation of the project 2 Generation solar walls is convering the work in an iterative process, with simulation, results analysis and programme study being the main elements. Thus, it
One main objective has been to co-ordinate the Danish activities within the IEA Bioenergy Agreement. Another international activity has been then chairmanship in the bioenergy processes/photosynthesis
Goal: To demonstrate the performance of a fuel cell bus in Copenhagen. Programme/Plan: When the bus is constructed, it will go into service in Berlin and then Copenhagen.
A 20 Nm2 Hydrogen storage has been specified to be used in a Ford Focus equipped with an internal combustion engine. The storage is constructed from commercial available metal hydrides.
The objectives of the project were to develop and manufacture a lightweight storage for hydrogen usable for pressures up to 300 bar and based on fibre reinforced tanks. Three storages have been
The objectives of the project have been to design and construct a PEM fuel cell driven car, which can be used for demonstration of hydrogen as a fuel in the transport sector. The project has been
The purpose of this project is to measure the reactivity of char from biomass (straw) during gasification. Especially catalytic effects will be examined.
The project is finished with the book 'Foresight' describing the paramount changes following the increased capacity of computers, reduced size, web connectivity, mobility and improved performance
De Nationale Geologiske Undersøgelser for Danmark og Grønland
EFP
1998
2000
The aim of the project is to improve the knowledge of flow mechanisms in fractured chalk reservoirs, and to improve the simulation tools for studying such reservoirs. Water injection in fractured
The goal of the project is 1.Study/test the performance of a prototype flywheel rotor for kinetic energy storage systems, developed and manufactured in a previous program, and 2. Perform feasibility