This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
The purpose is to secure a strong Danish representation in the international committee working with standardization through IEC TC-114. The project secures, that Denmark will be able to influence and
Weptos A/S receives the award "Årets bedste ForskEL projekt 2012" for best energy research project awarded by Energinet.DK. The award was given to Weptos A/S for an excellent and professionally
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the
Pre-study to design and demonstrate, in small scale, cost effective solutions for 3 commonly identified challenges in the wave power industry, which typically involves floating devices. High efficient
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test
The focus of the current project is to develop cost effective foundation and installation systems for Wave Energy Converters (WEC), by investigating and optimizing novel foundation systems recently
FLOAT2 continues the development of the promising results obtained in FLOAT (2011-1-10649) where significant cost reduction for the WaveStar converter was achieved by substituting the building
The goal for this demonstration project to undergo an independent validation of wave energy machine "Rolling Upright" in the wave tank under controlled conditions, and in doing so have developed a
LEANCON Wave Energy
ForskVE
2012
2016
This ForskEL project will document the energy production of the wave energy converter MAWEC in real production mode. The overall project description is the same as in PSO project "Advanced Wave Energy
The purpose of the project is to design, build and test a 2 kW wave energy grid connected Lever Operated Pivoting Float LOPF buoy in the sea. The goal is to collect operational data on electric
RESEN ENERGY ApS
ForskEL
2011
2012
Wave energy, Lever Operated Pivoting Float LOPF, study of new taut moored buoy concept with direct electrical output. It will cover: Basic static theoretical optimisation of LOPF concept, design of
The purpose of the project is improve the efficiency of Power Take off systems for Wave Energy Converters, by analysing and optimizing a new PTO-system with multiple pressure lines. This includes
HI-CON A/S
ForskEL
2011
2011
As an initial step for FLOAT – a project on using UHPC for wave energy floaters - a study has been undertaken to investigate preliminary design of 2 types of floaters, essential properties of UHPFRC