RUNE is short for - Reducing Uncertainty of Near-shore wind resource Estimates using onshore lidars. The key project aim is to reduce the uncertainty of offshore wind resources in Danish near-shore
This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
New cooling technology and newly developed communication and management solution allows access to untapped reserves the telecommunication companies. Reserves that are already established. The way to
A complete up-scaled version of BioSynergi Process' air-staged gasification-CHP system (300 kW electricity / 750 kJ /s of heat) is ready to start test operation in autumn 2014.The project covers the
The purpose of the project is final engineering, drawing, design, production and installation of a Crestwing prototype close to full scale. It will show its potential and demonstrate its high
Solid oxide electrolysis cells (SOECs) are a promising technology for energy storage and synthetic fuel production and it has a unique potential for grid regulation in the Danish power system. This
A main result of the Low Cost Active House BIPV project is to realise a demonstration campaign with 3 MWp, low cost BIPV solutions in connection to low energy class 2020, energy neutral and plus
The goal of SDVP Connect is to mobilize the Heat Pump ITC-platform, developed in collaboration with Energinet.dk and ForskEL, on the Smart Grid market.
Combining silicon solar cells and high efficiency solar cells into one cost-efficient, high-efficiency solar cell has been a dream of the solar industry for decades. However, differences in the
Grid side converter (GSC) is the key for PV integration. GSCs are still not capable of advanced control features that enable the full control of PV systems with fault ride through, reactive power
The overall target for this project is to develop an industrialized concept for Building Integrated Solar PV-BIPV that visualizes a number of added values, minimizes additional costs and thus paves
Despite the pre-selection of only the most promising energy solutions, the analyses and comparison of the chosen energy supply solution have revealed, that none of them are capable to turn out with an
The project has 2 objects: 1) to produce better chip quality or chunk to the gasification plants and 2) to provide essential data for the Danish as well as international standardisation work.
This project forms the Danish participation in an international IEA working group, which scope was to gather and process monitoring results from 15 low energy houses designed and build during the IEA
The purpose of the project was to construct and test a 2.5kW photovoltaic inverter (DC/AC) based on the same segment-switched stair-step concept developed under the EFP94, which was developed for 10
The project is concluded with an assessment as to whether Denmark should participate activily in IEA TASK 25, Solar Assisted Air. Conditioning of Buildings. The recommendation is that Denmark should
Forskningscenter for Elektroteknisk Energiomformning E/F (CETEC)
EFP
1999
2003
The project will contribute to an increase in the application of energy saving power electronic systems, which is obtained by the following means: 1) integration / miniaturization; 2) low total costs
BIOG supplemental is a small supplement to the project BIOG, Reference: 1383/98-0003. A number of students from Norway and Denmark have wished to stay at ReaTech to perform experiments related to