The objective of the project was to improve the use of animal manure for biogas production by a thermo-alcalic hydrolytic pre-treatment. Substantial gas yield improvements have been documented for all
This project will demonstrate erection and operation of an entire biomass gasification plant for CHP production in the commercial size of 1,300 kWth. In the project a complete commercial size forest
The aim of this project is to develop a wood stove with high energy efficiency and low emissions of pollutants and CO2. We will develop a generic control system for wood stoves and an optimized
Solum Gruppen has built two versions of an organic waste conversion plant - AIKAN - able to double the energy output of organic waste compared to the current solution, incineration.
The project resulted in the development, design, engineering, construction, and demonstration of a plant for industrial scale use of cereal straw for anaerobic digestion and production of biogas. The
Pretreatment and enzymatic hydrolysis for conversion of biomass to germentable sugars is by far the most expensive step in 2nd generation bioethanol production. The project aims at developing and
The project goal is to accelerate the implementation of large scale torrefaction technology able to produce up to 500.000 ton torrified material per year, thereby supporting the political aim of
In the following are show the different work packages. After each the timing and goals are shown: WP1 Screening test and optimization of basic parameters for efficient densification of torrefied
The IEA-Task 37, Energy from biogas is an international partnership of knowledge transfer and research exchange, aiming to carry out expert technical work, expert technical support to policy makers
The main objective of this project was to prepare the first ever REnescience commercial scale demonstration plant to be ready for operation before 2013.
New energy technologies enabling replacement of fossil fuels must be developed during the next decades. Gasification has been identified is an important contribution. This technology is expected to
The project designs and erects a demonstration plant with an annual output capacity of 5 million litres of bioethanol that can be followed at www.biogasol.com. The plant must under semi-industrial
The RETROGAS project aims at demonstrating viable production of biogas solely based on animal manure and methods of achieving balance of plant nutrients from animal slurry and manure at farm level
The project has to assure a better and more rewarding communication between researchers and practicians, light up the projects will become a good business , follow up ongoing projects and promote a
Dansk Biotek - Foreningen af Bioteknologiske Industrier i Danmark
EUDP
2008
2014
The Danish Government has launched the first collective Danish Action Plan for Eco-efficient Technology. The Action Plan will help ensuring that Denmark and Danish enterprises continues to be in the
Danish Technological Institute is the leader of one work package in this international project. Raw material which today is only partially or completely unexploited with respect to a biofuel resource
Stirling DK has designed and built a containerized combined heat and power plant with one Stirling engine and an up-draft gasifier fuelled by wood chips. The plant is fitted into three 20” standard
The project ''IEA Bioenergy - Task 37, Energy from biogas and landfill gas'' is in fact an international partnership of knowledge transfer and research exchange, aiming to carry out expert technical