To increase the interest for individual office lighting, the project developed a prototype of a more energy-efficient office lamp meeting the DS 700 requirements for illuminance. Both readings and
Anodising is an electrolytic process that gives aluminium a hard, wear-resistant, weatherproof, corrosion-proof and decorative surface, but which is also highly energy intensive. The project therefore
The primary scope of the project was: to develop and test methods to analyse how energy con-sumption in ventilation systems in EX-areas can be reduced. The results of the work showed are, that a paper
The objective of this project was to analyse the consequences for electricity consumption resulting from increased use of holiday cottages throughout the year. The project was carried out through four
The project did not succeed in detecting the utilisation rate of artificial lighting in potted plant production by measuring changes in CO2 concentrations. However, the project developed a calculation
Measurements were made in five swimming baths, and energy savings were achieved using new filters, pumps, water treatment control depending on bather load, etc. In a 50 metre pool, electricity
The project constituted the third and final phase of a project programme that analysed demandcontrolled ventilation in blocks of flats. Project measurements in selected test flats where the influx of