This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
The purpose is to secure a strong Danish representation in the international committee working with standardization through IEC TC-114. The project secures, that Denmark will be able to influence and
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
LEANCON Wave Energy
ForskVE
2012
2016
This ForskEL project will document the energy production of the wave energy converter MAWEC in real production mode. The overall project description is the same as in PSO project "Advanced Wave Energy
The purpose of the project is to design, build and test a 2 kW wave energy grid connected Lever Operated Pivoting Float LOPF buoy in the sea. The goal is to collect operational data on electric
Establishment of a data base of O&M data for Wave Dragon established in Nissum Bredning. Large uncertainty exists about fatigue impact on single components used in a wave device caused by repeated
Grid connection and electricity production optimisation from a 500 kW Wave Star wave power unit located at Horns Rev. The project is closely linked to project 10239. If the project achieves the
Optimization of power production and reliability of the Wave Star prototype in Hanstholm. The funding is given as a temporary additional per production hour, and is activated by attainment of