This project aims at testing the Weptos WEC for the first time in an uncontrolled - real sea environment. This will give the opportunity to check the extensive findings from the previous
A complete up-scaled version of BioSynergi Process' air-staged gasification-CHP system (300 kW electricity / 750 kJ /s of heat) is ready to start test operation in autumn 2014.The project covers the
The aim of the project is to work with Danish housing associations to organise sketch designs and realisation of building integration of PV solutions (BIPV). The total proposed implementation for roof
The purpose is to secure a strong Danish representation in the international committee working with standardization through IEC TC-114. The project secures, that Denmark will be able to influence and
Using electric alternating gasification, wood chips can be converted to syngas, which is used to increase methane production in a biogas process. The uniquely produced gas in not diluted with nitrogen
The project aims to determine how new renewable energy sources can be included in the electricity system, in operational planning and in the supply of reserve and regulating power. It will be
Dansk Energi
ForskVE
2014
2017
The scope for the EVCOM project is to specify harmonized data formats for exchanging data for controlling, regulating and billing EV charging in Denmark. The data formats must support a wide number of
HPCOM project supports the development and implementation of information- and data- communication infrastructure within the area of individual heat pumps. The project covers data communication from
In the BIPV Quality Cities project the total amount of PV systems with special focus on BIPV Quality, Solar Watch online monitoring and a combined focus electricity savings will amount to 3.850 kWp.
The main purpose of the planned Phase III (PVIB-III) is establishment of 1,5 – 2 MW of additional capacity primarily in terms of a large utility scale PV power plant of at least 1,5 MW. Thus very
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the
The scope of PV GRID is to address the large potential for stimulating commercial investment in PV in DK. The project purpose is to address identified barriers and assign possible solutions. A central
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
Based on the Stirling engine technology the goal is to demonstrate how small scale RE based CHP plants can be the solution for many small and medium sized companies to reach a more green production
LEANCON Wave Energy
ForskVE
2012
2016
This ForskEL project will document the energy production of the wave energy converter MAWEC in real production mode. The overall project description is the same as in PSO project "Advanced Wave Energy
The purpose of the project is to design, build and test a 2 kW wave energy grid connected Lever Operated Pivoting Float LOPF buoy in the sea. The goal is to collect operational data on electric
The aim of the project is to ensure a technical and economical strong commencement of the operation of a complete entire CHP biomass gasification plant. The additional feed in tariff from the ForskVE
As a follow-up to PV Island Bornholm, Phase I project targeting implementation of 1 MWp of PV on the island of Bornholm, it is proposed to establish a phase II targeting an additional 1 MWp. The
Development/demonstration of economically viable small CHP plants based on gasification and steam raising through burning of the clean gas in once through steam boilers at high steam temperatures and