Projektet omfatter assistancen til opgaver i forbindelse med Danmarks medlemskab af IEA-OES i 2016:
I lighed med 2014 dækker ansøgningen deltagelse i de årlige EXCO møder
30 de ExCo Meeting
It is possible to reduce the Cost of Energy from Wave Energy Converters by utilizing Digital Hydraulic Power Take Off. The project aims at solving the main technical hindrance for enabling wave energy
The purpose is to secure a strong Danish representation in the international committee working with standardization through IEC TC-114. The project secures, that Denmark will be able to influence and
The project is part of the development of a tradition of cooperation for further development of wave energy, here, through the implementation of an exemplary development process. The project contains
The objective of the project is to develop a gyro electric converter unit for wave energy, and to test experimentally a 5 kW unit under realistic conditions.
The objective of this proof of concept project is to investigate the WaveSpring technology and how it can benefit wave energy converters (WECs). It is expected that the results from the project will
The objectives of the project are to design, test and develop cost efficient mooring solutions for large floating wave energy converters (WECs) and to build national competences in design and
Weptos A/S receives the award "Årets bedste ForskEL projekt 2012" for best energy research project awarded by Energinet.DK. The award was given to Weptos A/S for an excellent and professionally
The purpose of this project is to demonstrate and optimize the design of a 5 kW grid connected wave energy LOPF (Lever Operated Pivoting Float) buoy, through a design study and subsequent test in the
Pre-study to design and demonstrate, in small scale, cost effective solutions for 3 commonly identified challenges in the wave power industry, which typically involves floating devices. High efficient
The objective for Partnership for Wavepower Roadmaps are to consolidate and combine the Danish Wave Developers common efforts and produce plans to achieve common goals for Anchor systems, Power
The project deals with the continued operation and development of Wave Star pilot plant in Hanstholm with a focus on increasing the service life and reduce operating and maintenance costs, thus
DanWEC Fonden
Green Labs DK
2013
2013
SPOK Consult ApS
ForskEL
2012
2012
The project examines the predictability of theoretical and sea-measured power productions of 3 wave technologies (Pelamis, Wave Dragon and Wavestar), working alone, in combinations of 2, all together
Project "Crest Wing final test follow-up offshore" covers building, laying and offshore test of a Crestwing WEC in a scale of 1-5 full-scale Hanstholm. The purpose of the test run is based on DHI test