BioUpgrade is aiming at developing an innovative, efficient and robust technology for biological biogas upgrade, utilising the indigenous hydrogenotrophic cultures of the anaerobic digestion process
This main objective of this project is to demonstrate procedures that can quantify the risk of failure, the remaining structural reliability and the maintenance costs upon extending the life of
IEA Wind Task 28” on Social Acceptance of Wind Energy Projects is a working group involving several countries, including the USA, Germany, Denmark, Switzerland, Japan, Ireland, Italy and the
Because these hours are incoherent and unpredictable, a constant availability of power is imperative and as a result the generator has to be operating around the clock. Thus Power Pack will contribute
A wind turbine power converter includes power modules mounted on cooling plates, which cool the component. The heat is transferred to the ambient by use of a water circuit and an air cooler. The
The project has generally the aim to support Denmark's participation in the "IEA Wind Energy R & D Implementing Agreement" in 2018 through participation as Alternate member in the Agreement Steering
The project will design and test innovative blade tips for wind turbines which can increase the existing rotor size, producing up to 8% more energy per year, while regulating loads in a smart way.
Every wind farm project requires accurate resource assessments to evaluate the energy yield and profitability, but for projects in hilly, mountainous or forested areas the measurement campaigns can be
Small cracks in wind turbine bearings are responsible for some of the most expensive wind turbine failures. Today, there are no certain methods of preventing the cracks, but a new project led by DTU
The annex will give the participants an overview of the technical and environmental assessment challenges encountered in offshore applications and help them to understand the areas of further R and D
The aim of the project is to utilize Denmark's position and to develop international collaborations in order to optimize four major steps in the Danish Bioethanol concept.
The gasproduction from liquid manure in terms of volume is low and the economy of the plants are often very dependent on the supply of easy degradable waste products and at the moment the extension of
The main objective of the project was to improve biogas production from manures. This objective was addressed by investigating: 1) the effect of different reactor configurations, 2) operational
The purpose of the project is to clarify advantages and disadvantages, potentials and possible problems when burning or gasifying the separated fibre fraction from biogas production, before the fibre
The project included the second phase of a process aimed at establishing a platform for wind turbine simulation as a prerequisite for advanced electrical design and optimisation.